Hillside Road over Mission Creek
GoodPosted for loadLake County, Montana · 1.5 Miles E. St. Ignatius · Structure no. 000000202108035
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Hillside Road over Mission Creek is a steel stringer/multi-beam or girder carrying Hillside Road over Mission Creek in Lake County, Montana. It was built in 2021, so it is 4 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 40 ft (12.2 m) long and 20 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hillside Road over Mission Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is Hillside Road over Mission Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Hillside Road over Mission Creek carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Hillside Road over Mission Creek?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.6 m) and a deck 20 ft wide.
Who owns Hillside Road over Mission Creek?
It is owned by the County Highway Agency.