Hemlock Trail over Blackbird CR
FairPutnam County, Missouri · S 4 T 64 N R 17 W · Structure no. 20473
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 10
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Hemlock Trail over Blackbird CR is a steel stringer/multi-beam or girder carrying Hemlock Trail over Blackbird CR in Putnam County, Missouri. It was built in 1991, so it is 34 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 11 by 2044. The structure is 122 ft (37.2 m) long and 17 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hemlock Trail over Blackbird CR built?
It was built in 1991, making it 34 years old in 2025.
What condition is Hemlock Trail over Blackbird CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Hemlock Trail over Blackbird CR carry?
About 10 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Hemlock Trail over Blackbird CR?
The structure is 122 ft (37.2 m) long with a longest span of 78 ft (23.8 m) and a deck 17 ft wide.
Who owns Hemlock Trail over Blackbird CR?
It is owned by the County Highway Agency.