US Bridges

Olive Trail over Blackbird CR

FairPosted for load

Putnam County, Missouri · S 4 T 64 N R 17 W · Structure no. 20420

Built
1986
39 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
49 ft
1 main span
Daily traffic
10
2024 count
Owner
County
County Highway Agency

About this bridge

Olive Trail over Blackbird CR is a steel stringer/multi-beam or girder carrying Olive Trail over Blackbird CR in Putnam County, Missouri. It was built in 1986, so it is 39 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 11 by 2044. The structure is 49 ft (14.9 m) long and 14 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesOlive Trail
CrossesBlackbird CR
LocationS 4 T 64 N R 17 W
RouteCounty Highway 259
Coordinates40.38345, -92.81868
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22.8 US tons
Inventory rating13.9 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1 (+1 approach)
Design loadOther
Structure length49 ft (14.9 m)
Longest span34 ft (10.4 m)
Deck width14 ft (4.4 m)
Roadway width13 ft (4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2024)
Projected traffic11 by 2044
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Olive Trail over Blackbird CR built?

It was built in 1986, making it 39 years old in 2025.

What condition is Olive Trail over Blackbird CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Olive Trail over Blackbird CR carry?

About 10 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Olive Trail over Blackbird CR?

The structure is 49 ft (14.9 m) long with a longest span of 34 ft (10.4 m) and a deck 14 ft wide.

Who owns Olive Trail over Blackbird CR?

It is owned by the County Highway Agency.