Gold Dust Trail over Br of N Blackbird
GoodPutnam County, Missouri · S 29 T 65 N R 17 W · Structure no. 20381
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 1 main span
- Daily traffic
- 5
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Gold Dust Trail over Br of N Blackbird is a steel stringer/multi-beam or girder carrying Gold Dust Trail over Br of N Blackbird in Putnam County, Missouri. It was built in 1998, so it is 27 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5 vehicles a day, roughly 10% of them trucks, projected to reach 6 by 2044. The structure is 45 ft (13.7 m) long and 18 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gold Dust Trail over Br of N Blackbird built?
It was built in 1998, making it 27 years old in 2025.
What condition is Gold Dust Trail over Br of N Blackbird in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Gold Dust Trail over Br of N Blackbird carry?
About 5 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Gold Dust Trail over Br of N Blackbird?
The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.4 m) and a deck 18 ft wide.
Who owns Gold Dust Trail over Br of N Blackbird?
It is owned by the County Highway Agency.