Mn 220 over Jud Ditch # 75

Good

Polk County, Minnesota · 5.6 MI S of Alvarado · Structure no. 60026

Built
2017
8 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
78 ft
1 main span
Daily traffic
1,450
2018 count
Owner
State
State Highway Agency

About this bridge

Mn 220 over Jud Ditch # 75 is a prestressed concrete stringer/multi-beam or girder carrying Mn 220 over Jud Ditch # 75 in Polk County, Minnesota. It was built in 2017, so it is 8 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,450 vehicles a day, roughly 9% of them trucks, projected to reach 1,350 by 2038. The structure is 78 ft (23.8 m) long and 47 ft wide. If it were closed, the detour would be 18 mi (29 km).

CarriesMn 220
CrossesJud Ditch # 75
Location5.6 MI S of Alvarado
RouteState Highway 220
Coordinates48.10774, -96.99834
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating41.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length78 ft (23.8 m)
Longest span76 ft (23.2 m)
Deck width47 ft (14.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,450 (2018)
Projected traffic1,350 by 2038
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18 mi (29 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mn 220 over Jud Ditch # 75 built?

It was built in 2017, making it 8 years old in 2025.

What condition is Mn 220 over Jud Ditch # 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Mn 220 over Jud Ditch # 75 carry?

About 1,450 vehicles per day (2018 count), of which roughly 9% are trucks.

How long is Mn 220 over Jud Ditch # 75?

The structure is 78 ft (23.8 m) long with a longest span of 76 ft (23.2 m) and a deck 47 ft wide.

Who owns Mn 220 over Jud Ditch # 75?

It is owned by the State Highway Agency.