US Bridges

T 418 over Jud Ditch # 75

Fair

Polk County, Minnesota · 1.9 MI N of JCT Csah 23 · Structure no. 60544

Built
2002
23 years old
Condition
Fair
inspected October 2023
Type
Slab
Concrete Continuous
Length
89 ft
3 main spans
Daily traffic
20
2001 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 418 over Jud Ditch # 75 is a concrete continuous slab carrying T 418 over Jud Ditch # 75 in Polk County, Minnesota. It was built in 2002, so it is 23 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, projected to reach 20 by 2029. The structure is 89 ft (27 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 418
CrossesJud Ditch # 75
Location1.9 MI N of JCT Csah 23
RouteCounty Highway 418
Coordinates48.10783, -96.95506
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating59.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length89 ft (27 m)
Longest span33 ft (10.1 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2001)
Projected traffic20 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 418 over Jud Ditch # 75 built?

It was built in 2002, making it 23 years old in 2025.

What condition is T 418 over Jud Ditch # 75 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does T 418 over Jud Ditch # 75 carry?

About 20 vehicles per day (2001 count).

How long is T 418 over Jud Ditch # 75?

The structure is 89 ft (27 m) long with a longest span of 33 ft (10.1 m) and a deck 35 ft wide.

Who owns T 418 over Jud Ditch # 75?

It is owned by the Town or Township Highway Agency.