US Bridges

T 333 over Jud Ditch # 75

Good

Polk County, Minnesota · 1.9 MI N JCT Csah 22 · Structure no. 60554

Built
2006
19 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
97 ft
3 main spans
Daily traffic
49
2005 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 333 over Jud Ditch # 75 is a prestressed concrete stringer/multi-beam or girder carrying T 333 over Jud Ditch # 75 in Polk County, Minnesota. It was built in 2006, so it is 19 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, projected to reach 49 by 2025. The structure is 97 ft (29.5 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 333
CrossesJud Ditch # 75
Location1.9 MI N JCT Csah 22
RouteCounty Highway 333
Coordinates48.10751, -97.04163
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating109.8 US tons
Inventory rating54.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length97 ft (29.5 m)
Longest span32 ft (9.7 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2005)
Projected traffic49 by 2025
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 333 over Jud Ditch # 75 built?

It was built in 2006, making it 19 years old in 2025.

What condition is T 333 over Jud Ditch # 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T 333 over Jud Ditch # 75 carry?

About 49 vehicles per day (2005 count).

How long is T 333 over Jud Ditch # 75?

The structure is 97 ft (29.5 m) long with a longest span of 32 ft (9.7 m) and a deck 31 ft wide.

Who owns T 333 over Jud Ditch # 75?

It is owned by the Town or Township Highway Agency.