Radecke Avenue over Moores Run
PoorBaltimore city, Maryland · 0.2 MI W Cedonia Ave · Structure no. 200000BC4405010
- Built
- 1930
- 95 years old, rebuilt 1960
- Condition
- Poor
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 36 ft
- 1 main span
- Daily traffic
- 10,737
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Radecke Avenue over Moores Run is a steel stringer/multi-beam or girder carrying Radecke Avenue over Moores Run in Baltimore city, Maryland. It was built in 1930 and reconstructed in 1960, so it is 95 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 10,737 vehicles a day, roughly 5% of them trucks, projected to reach 13,102 by 2036. The structure is 36 ft (11 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Radecke Avenue over Moores Run built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1960.
What condition is Radecke Avenue over Moores Run in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does Radecke Avenue over Moores Run carry?
About 10,737 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Radecke Avenue over Moores Run?
The structure is 36 ft (11 m) long with a longest span of 32 ft (9.8 m) and a deck 51 ft wide.
Who owns Radecke Avenue over Moores Run?
It is owned by the City or Municipal Highway Agency.