US Bridges

I-895 SB over Moores Run

Good

Baltimore city, Maryland · I-895 SB Milepost 14.54 · Structure no. 300000BCY147010

Built
2009
16 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
122 ft
1 main span
Daily traffic
78,180
2019 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-895 SB over Moores Run is a prestressed concrete box beam or girders - multiple carrying I-895 SB over Moores Run in Baltimore city, Maryland. It was built in 2009, so it is 16 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 78,180 vehicles a day, roughly 14% of them trucks, projected to reach 103,873 by 2041. The structure is 122 ft (37.2 m) long and 57 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesI-895 SB
CrossesMoores Run
LocationI-895 SB Milepost 14.54
RouteInterstate 895
Coordinates39.31742, -76.53544
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.4 US tons
Inventory rating59.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length122 ft (37.2 m)
Longest span116 ft (35.4 m)
Deck width57 ft (17.3 m)
Roadway width52 ft (16 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic78,180 (2019)
Projected traffic103,873 by 2041
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-895 SB over Moores Run built?

It was built in 2009, making it 16 years old in 2025.

What condition is I-895 SB over Moores Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I-895 SB over Moores Run carry?

About 78,180 vehicles per day (2019 count), of which roughly 14% are trucks.

How long is I-895 SB over Moores Run?

The structure is 122 ft (37.2 m) long with a longest span of 116 ft (35.4 m) and a deck 57 ft wide.

Who owns I-895 SB over Moores Run?

It is owned by the State Toll Authority.