US Bridges

I95 Northbound over Future Ramp Mb

Good

Baltimore County, Maryland · I695 IS95 Interchange · Structure no. 300000B-X639011

Built
2008
17 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
161 ft
1 main span
Daily traffic
52,628
2019 count
Owner
Toll Authority
State Toll Authority

About this bridge

I95 Northbound over Future Ramp Mb is a steel stringer/multi-beam or girder carrying I95 Northbound over Future Ramp Mb in Baltimore County, Maryland. It was built in 2008, so it is 17 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52,628 vehicles a day, roughly 14% of them trucks, projected to reach 73,821 by 2041. The structure is 161 ft (49.2 m) long and 68 ft wide.

CarriesI95 Northbound
CrossesFuture Ramp Mb
LocationI695 IS95 Interchange
RouteInterstate 95
Coordinates39.35151, -76.4938
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating67.5 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length161 ft (49.2 m)
Longest span150 ft (45.7 m)
Deck width68 ft (20.7 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deck18 ft (5.5 m)

Traffic and service

Average daily traffic52,628 (2019)
Projected traffic73,821 by 2041
Trucks14%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I95 Northbound over Future Ramp Mb built?

It was built in 2008, making it 17 years old in 2025.

What condition is I95 Northbound over Future Ramp Mb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I95 Northbound over Future Ramp Mb carry?

About 52,628 vehicles per day (2019 count), of which roughly 14% are trucks.

How long is I95 Northbound over Future Ramp Mb?

The structure is 161 ft (49.2 m) long with a longest span of 150 ft (45.7 m) and a deck 68 ft wide.

Who owns I95 Northbound over Future Ramp Mb?

It is owned by the State Toll Authority.