US Bridges

I 90 EB over HWY Woodland RD

Good

Worcester County, Massachusetts · I-90 Mm 109.3 · Structure no. S200244NMDOTNBI

Built
1957
68 years old, rebuilt 2021
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
51,120
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 EB over HWY Woodland RD is a prestressed concrete tee beam carrying I 90 EB over HWY Woodland RD in Worcester County, Massachusetts. It was built in 1957 and reconstructed in 2021, so it is 68 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 51,120 vehicles a day, roughly 9% of them trucks, projected to reach 148,748 by 2031. The structure is 40 ft (12.1 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 90 EB
CrossesHWY Woodland RD
LocationI-90 Mm 109.3
RouteInterstate 90
Coordinates42.28059, -71.51478
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating42.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.1 m)
Longest span35 ft (10.8 m)
Deck width56 ft (17.2 m)
Roadway width53 ft (16.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51,120 (2023)
Projected traffic148,748 by 2031
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 EB over HWY Woodland RD built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2021.

What condition is I 90 EB over HWY Woodland RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I 90 EB over HWY Woodland RD carry?

About 51,120 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I 90 EB over HWY Woodland RD?

The structure is 40 ft (12.1 m) long with a longest span of 35 ft (10.8 m) and a deck 56 ft wide.

Who owns I 90 EB over HWY Woodland RD?

It is owned by the State Highway Agency.