Good

Worcester County, Massachusetts · I-90 Mm 108.7 · Structure no. S20023C84DOTNBI

Built
2021
4 years old
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
50,878
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 WB over ST 85 Cordaville RD is a prestressed concrete tee beam carrying I 90 WB over ST 85 Cordaville RD in Worcester County, Massachusetts. It was built in 2021, so it is 4 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,878 vehicles a day, roughly 10% of them trucks. The structure is 75 ft (22.9 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI 90 WB
CrossesST 85 Cordaville RD
LocationI-90 Mm 108.7
RouteInterstate 90
Coordinates42.27816, -71.5252
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length75 ft (22.9 m)
Longest span71 ft (21.5 m)
Deck width56 ft (17.2 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,878 (2023)
Projected traffic—
Trucks10%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 WB over ST 85 Cordaville RD built?

It was built in 2021, making it 4 years old in 2025.

What condition is I 90 WB over ST 85 Cordaville RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I 90 WB over ST 85 Cordaville RD carry?

About 50,878 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is I 90 WB over ST 85 Cordaville RD?

The structure is 75 ft (22.9 m) long with a longest span of 71 ft (21.5 m) and a deck 56 ft wide.

Who owns I 90 WB over ST 85 Cordaville RD?

It is owned by the State Highway Agency.