US Bridges

HWY Oak ST over I 90

Fair

Middlesex County, Massachusetts · At I-90 Mm 110.2 · Structure no. A140204NYDOTNBI

Built
1957
68 years old, rebuilt 1995
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
208 ft
2 main spans
Daily traffic
2,200
2023 count
Owner
State
State Highway Agency

About this bridge

HWY Oak ST over I 90 is a steel continuous stringer/multi-beam or girder carrying HWY Oak ST over I 90 in Middlesex County, Massachusetts. It was built in 1957 and reconstructed in 1995, so it is 68 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,200 vehicles a day, roughly 5% of them trucks, projected to reach 4,738 by 2032. The structure is 208 ft (63.4 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesHWY Oak ST
CrossesI 90
LocationAt I-90 Mm 110.2
RouteCity Street 0
Coordinates42.28532, -71.49816
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.1 US tons
Inventory rating27 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length208 ft (63.4 m)
Longest span66 ft (20.2 m)
Deck width34 ft (10.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,200 (2023)
Projected traffic4,738 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$6.5 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Oak ST over I 90 built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1995.

What condition is HWY Oak ST over I 90 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does HWY Oak ST over I 90 carry?

About 2,200 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is HWY Oak ST over I 90?

The structure is 208 ft (63.4 m) long with a longest span of 66 ft (20.2 m) and a deck 34 ft wide.

Who owns HWY Oak ST over I 90?

It is owned by the State Highway Agency.