US Bridges

US 1 Nb/Low Deck over HWY Chelsea Local Stre

Poor

Suffolk County, Massachusetts · Chel Appr Low · Structure no. B160174WYDOTNBI

Built
1950
75 years old
Condition
Poor
inspected November 2023
Type
Girder and Floorbeam System
Steel
Length
2,829 ft
30 main spans
Daily traffic
42,492
2022 count
Owner
State
State Highway Agency

About this bridge

US 1 Nb/Low Deck over HWY Chelsea Local Stre is a steel girder and floorbeam system carrying US 1 Nb/Low Deck over HWY Chelsea Local Stre in Suffolk County, Massachusetts. It was built in 1950, so it is 75 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 42,492 vehicles a day, roughly 7% of them trucks, projected to reach 70,595 by 2032. The structure is 2,829 ft (862.3 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesUS 1 Nb/Low Deck
CrossesHWY Chelsea Local Stre
LocationChel Appr Low
RouteU.S. Route 1
Coordinates42.39006, -71.04174
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2023
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment7: Better than present minimum criteria
Operating rating19.8 US tons
Inventory rating11.9 US tons

Structure

MaterialSteel
DeckClosed grating
Main spans30
Design loadHS 20
Structure length2,829 ft (862.3 m)
Longest span103 ft (31.4 m)
Deck width42 ft (12.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deck15 ft (4.7 m)

Traffic and service

Average daily traffic42,492 (2022)
Projected traffic70,595 by 2032
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollToll bridge
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$225.2 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 1 Nb/Low Deck over HWY Chelsea Local Stre built?

It was built in 1950, making it 75 years old in 2025.

What condition is US 1 Nb/Low Deck over HWY Chelsea Local Stre in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2023.

How much traffic does US 1 Nb/Low Deck over HWY Chelsea Local Stre carry?

About 42,492 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is US 1 Nb/Low Deck over HWY Chelsea Local Stre?

The structure is 2,829 ft (862.3 m) long with a longest span of 103 ft (31.4 m) and a deck 42 ft wide.

Who owns US 1 Nb/Low Deck over HWY Chelsea Local Stre?

It is owned by the State Highway Agency.