US Bridges

US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST

Good

Suffolk County, Massachusetts · .7 MI NE of Tobin Br. · Structure no. C090073ABDOTNBI

Built
1957
68 years old, rebuilt 2021
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
874 ft
12 main spans
Daily traffic
41,988
2022 count
Owner
State
State Highway Agency

About this bridge

US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST is a steel stringer/multi-beam or girder carrying US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST in Suffolk County, Massachusetts. It was built in 1957 and reconstructed in 2021, so it is 68 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 41,988 vehicles a day, roughly 10% of them trucks, projected to reach 71,068 by 2032. The structure is 874 ft (266.4 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 1 Nb/S Abt PR1
CrossesHWY Arlington & 5th ST
Location.7 MI NE of Tobin Br.
RouteU.S. Route 1
Coordinates42.39476, -71.03499
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment7: Better than present minimum criteria
Operating rating75.4 US tons
Inventory rating45.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans12
Design loadHS 20
Structure length874 ft (266.4 m)
Longest span80 ft (24.4 m)
Deck width47 ft (14.3 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,988 (2022)
Projected traffic71,068 by 2032
Trucks10%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2021.

What condition is US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST carry?

About 41,988 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST?

The structure is 874 ft (266.4 m) long with a longest span of 80 ft (24.4 m) and a deck 47 ft wide.

Who owns US 1 Nb/S Abt PR1 over HWY Arlington & 5th ST?

It is owned by the State Highway Agency.