I 90 Ex 111 in 12 over I 90
FairMiddlesex County, Massachusetts · I 90 Mm 111.2 · Structure no. F070494PNDOTNBI
- Built
- 1957
- 68 years old, rebuilt 1994
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 201 ft
- 2 main spans
- Daily traffic
- 10,271
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 Ex 111 in 12 over I 90 is a steel continuous stringer/multi-beam or girder carrying I 90 Ex 111 in 12 over I 90 in Middlesex County, Massachusetts. It was built in 1957 and reconstructed in 1994, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,271 vehicles a day, roughly 6% of them trucks, projected to reach 632 by 2031. The structure is 201 ft (61.3 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 Ex 111 in 12 over I 90 built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1994.
What condition is I 90 Ex 111 in 12 over I 90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does I 90 Ex 111 in 12 over I 90 carry?
About 10,271 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is I 90 Ex 111 in 12 over I 90?
The structure is 201 ft (61.3 m) long with a longest span of 75 ft (22.8 m) and a deck 55 ft wide.
Who owns I 90 Ex 111 in 12 over I 90?
It is owned by the State Highway Agency.