Le Violon RD over Ile Des Cannes Coulee
FairLafayette Parish, Louisiana · 1 MI North of Congress ST · Structure no. 032830125920651
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete
- Length
- 76 ft
- 4 main spans
- Daily traffic
- 2,400
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Le Violon RD over Ile Des Cannes Coulee is a concrete slab carrying Le Violon RD over Ile Des Cannes Coulee in Lafayette Parish, Louisiana. It was built in 1977, so it is 48 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,400 vehicles a day, projected to reach 2,640 by 2040. The structure is 76 ft (23.2 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Le Violon RD over Ile Des Cannes Coulee built?
It was built in 1977, making it 48 years old in 2025.
What condition is Le Violon RD over Ile Des Cannes Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Le Violon RD over Ile Des Cannes Coulee carry?
About 2,400 vehicles per day (2020 count).
How long is Le Violon RD over Ile Des Cannes Coulee?
The structure is 76 ft (23.2 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.
Who owns Le Violon RD over Ile Des Cannes Coulee?
It is owned by the City or Municipal Highway Agency.