US Bridges

Fenetre Rd. over Ile Des Cannes Coulee

Poor

Lafayette Parish, Louisiana · .94 MI East of Tabb RD · Structure no. 032830133920631

Built
1983
42 years old
Condition
Poor
inspected October 2023
Type
Slab
Concrete
Length
76 ft
4 main spans
Daily traffic
200
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Fenetre Rd. over Ile Des Cannes Coulee is a concrete slab carrying Fenetre Rd. over Ile Des Cannes Coulee in Lafayette Parish, Louisiana. It was built in 1983, so it is 42 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 200 vehicles a day, projected to reach 220 by 2040. The structure is 76 ft (23.2 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFenetre Rd.
CrossesIle Des Cannes Coulee
Location.94 MI East of Tabb RD
RouteCounty Highway 0
Coordinates30.22166, -92.10524
Functional classUrban Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating25.7 US tons
Inventory rating20 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length76 ft (23.2 m)
Longest span19 ft (5.8 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2020)
Projected traffic220 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fenetre Rd. over Ile Des Cannes Coulee built?

It was built in 1983, making it 42 years old in 2025.

What condition is Fenetre Rd. over Ile Des Cannes Coulee in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.

How much traffic does Fenetre Rd. over Ile Des Cannes Coulee carry?

About 200 vehicles per day (2020 count).

How long is Fenetre Rd. over Ile Des Cannes Coulee?

The structure is 76 ft (23.2 m) long with a longest span of 19 ft (5.8 m) and a deck 26 ft wide.

Who owns Fenetre Rd. over Ile Des Cannes Coulee?

It is owned by the City or Municipal Highway Agency.