Denais Rd. over Coulee
FairPosted for loadLafayette Parish, Louisiana · .01 Miles N Leblanc RD · Structure no. 032830077920801
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 38 ft
- 2 main spans
- Daily traffic
- 210
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Denais Rd. over Coulee is a concrete slab carrying Denais Rd. over Coulee in Lafayette Parish, Louisiana. It was built in 1978, so it is 47 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 210 vehicles a day, projected to reach 231 by 2040. The structure is 38 ft (11.6 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Denais Rd. over Coulee built?
It was built in 1978, making it 47 years old in 2025.
What condition is Denais Rd. over Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Denais Rd. over Coulee carry?
About 210 vehicles per day (2020 count).
How long is Denais Rd. over Coulee?
The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.
Who owns Denais Rd. over Coulee?
It is owned by the County Highway Agency.