Leblanc RD over Coulee
GoodLafayette Parish, Louisiana · 1.1 Mi. W. of US 167 · Structure no. 032800000030523
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 1,153
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Leblanc RD over Coulee is a prestressed concrete stringer/multi-beam or girder carrying Leblanc RD over Coulee in Lafayette Parish, Louisiana. It was built in 2018, so it is 7 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,153 vehicles a day, projected to reach 1,268 by 2040. The structure is 80 ft (24.4 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Leblanc RD over Coulee built?
It was built in 2018, making it 7 years old in 2025.
What condition is Leblanc RD over Coulee in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Leblanc RD over Coulee carry?
About 1,153 vehicles per day (2020 count).
How long is Leblanc RD over Coulee?
The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.
Who owns Leblanc RD over Coulee?
It is owned by the County Highway Agency.