Fdr 900 over Trib. Corney Creek
FairClaiborne Parish, Louisiana · 1.79 Mi. W. Fo La. 9 · Structure no. 080608000002807
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 39 ft
- 2 main spans
- Daily traffic
- 50
- 1975 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Fdr 900 over Trib. Corney Creek is a wood or timber stringer/multi-beam or girder carrying Fdr 900 over Trib. Corney Creek in Claiborne Parish, Louisiana. It was built in 1974, so it is 51 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 39 ft (11.9 m) long and 24 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fdr 900 over Trib. Corney Creek built?
It was built in 1974, making it 51 years old in 2025.
What condition is Fdr 900 over Trib. Corney Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Fdr 900 over Trib. Corney Creek carry?
About 50 vehicles per day (1975 count).
How long is Fdr 900 over Trib. Corney Creek?
The structure is 39 ft (11.9 m) long with a longest span of 20 ft (6.1 m) and a deck 24 ft wide.
Who owns Fdr 900 over Trib. Corney Creek?
It is owned by the U.S. Forest Service.