Gilbert Drive over Pierremont Ditch
FairCaddo Parish, Louisiana · 0.5 Mi. North of LA 511 · Structure no. 040932269934421
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected April 2023
- Type
- Channel Beam
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 100
- 1989 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Gilbert Drive over Pierremont Ditch is a concrete channel beam carrying Gilbert Drive over Pierremont Ditch in Caddo Parish, Louisiana. It was built in 1984, so it is 41 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, projected to reach 110 by 2009. The structure is 32 ft (9.8 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gilbert Drive over Pierremont Ditch built?
It was built in 1984, making it 41 years old in 2025.
What condition is Gilbert Drive over Pierremont Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Gilbert Drive over Pierremont Ditch carry?
About 100 vehicles per day (1989 count).
How long is Gilbert Drive over Pierremont Ditch?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 44 ft wide.
Who owns Gilbert Drive over Pierremont Ditch?
It is owned by the City or Municipal Highway Agency.