US Bridges

Berkshire Place over Pierremont Ditch

FairPosted for load

Caddo Parish, Louisiana · 0.1 Mi. East of Gilbert · Structure no. 040932269934411

Built
1982
43 years old
Condition
Fair
inspected April 2023
Type
Channel Beam
Concrete
Length
31 ft
1 main span
Daily traffic
250
1979 count
Owner
City
City or Municipal Highway Agency

About this bridge

Berkshire Place over Pierremont Ditch is a concrete channel beam carrying Berkshire Place over Pierremont Ditch in Caddo Parish, Louisiana. It was built in 1982, so it is 43 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 250 vehicles a day, projected to reach 275 by 1999. The structure is 31 ft (9.4 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBerkshire Place
CrossesPierremont Ditch
Location0.1 Mi. East of Gilbert
RouteCounty Highway 0
Coordinates32.448, -93.73589
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating26.8 US tons
Inventory rating20.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length31 ft (9.4 m)
Longest span29 ft (8.8 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (1979)
Projected traffic275 by 1999
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Berkshire Place over Pierremont Ditch built?

It was built in 1982, making it 43 years old in 2025.

What condition is Berkshire Place over Pierremont Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Berkshire Place over Pierremont Ditch carry?

About 250 vehicles per day (1979 count).

How long is Berkshire Place over Pierremont Ditch?

The structure is 31 ft (9.4 m) long with a longest span of 29 ft (8.8 m) and a deck 30 ft wide.

Who owns Berkshire Place over Pierremont Ditch?

It is owned by the City or Municipal Highway Agency.