150 Ave (1st St) over Trib. to S. Fork Solomon
FairPosted for loadGraham County, Kansas · SE Corner Morland · Structure no. 000330527003905
- Built
- 1935
- 90 years old
- Condition
- Fair
- inspected May 2024
- Type
- Tee Beam
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 60
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
150 Ave (1st St) over Trib. to S. Fork Solomon is a concrete tee beam carrying 150 Ave (1st St) over Trib. to S. Fork Solomon in Graham County, Kansas. It was built in 1935, so it is 90 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 60 vehicles a day, projected to reach 60 by 2044. The structure is 32 ft (9.9 m) long and 24 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 150 Ave (1st St) over Trib. to S. Fork Solomon built?
It was built in 1935, making it 90 years old in 2025.
What condition is 150 Ave (1st St) over Trib. to S. Fork Solomon in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does 150 Ave (1st St) over Trib. to S. Fork Solomon carry?
About 60 vehicles per day (2020 count).
How long is 150 Ave (1st St) over Trib. to S. Fork Solomon?
The structure is 32 ft (9.9 m) long with a longest span of 30 ft (9 m) and a deck 24 ft wide.
Who owns 150 Ave (1st St) over Trib. to S. Fork Solomon?
It is owned by the County Highway Agency.