P Road (west) over South Fork Solomon River
GoodPosted for loadGraham County, Kansas · 1.1W of Morland · Structure no. 000330523403900
- Built
- 1960
- 65 years old, rebuilt 2014
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 60
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
P Road (west) over South Fork Solomon River is a steel continuous stringer/multi-beam or girder carrying P Road (west) over South Fork Solomon River in Graham County, Kansas. It was built in 1960 and reconstructed in 2014, so it is 65 years old, older than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 60 vehicles a day, projected to reach 60 by 2044. The structure is 137 ft (41.8 m) long and 25 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was P Road (west) over South Fork Solomon River built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2014.
What condition is P Road (west) over South Fork Solomon River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does P Road (west) over South Fork Solomon River carry?
About 60 vehicles per day (2020 count).
How long is P Road (west) over South Fork Solomon River?
The structure is 137 ft (41.8 m) long with a longest span of 56 ft (17 m) and a deck 25 ft wide.
Who owns P Road (west) over South Fork Solomon River?
It is owned by the County Highway Agency.