P Road (west) over Trib. to S. Fork Solomon
GoodGraham County, Kansas · 0.9E of Morland · Structure no. 000330527903900
- Built
- 1981
- 44 years old
- Condition
- Good
- inspected May 2024
- Type
- Culvert
- Concrete
- Length
- 37 ft
- 3 main spans
- Daily traffic
- 60
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
P Road (west) over Trib. to S. Fork Solomon is a concrete culvert carrying P Road (west) over Trib. to S. Fork Solomon in Graham County, Kansas. It was built in 1981, so it is 44 years old, younger than the Kansas average of 52.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60 vehicles a day, projected to reach 60 by 2044. The structure is 37 ft (11.4 m) long and 28 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was P Road (west) over Trib. to S. Fork Solomon built?
It was built in 1981, making it 44 years old in 2025.
What condition is P Road (west) over Trib. to S. Fork Solomon in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does P Road (west) over Trib. to S. Fork Solomon carry?
About 60 vehicles per day (2020 count).
How long is P Road (west) over Trib. to S. Fork Solomon?
The structure is 37 ft (11.4 m) long with a longest span of 12 ft (3.6 m) and a deck 28 ft wide.
Who owns P Road (west) over Trib. to S. Fork Solomon?
It is owned by the County Highway Agency.