TR 268 over TR1B to Silver Ck
FairMadison County, Illinois · 0.25MI W Livingston · Structure no. 060314200000000
- Built
- 1901
- 124 years old
- Condition
- Fair
- inspected May 2023
- Type
- Other
- Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 150
- 2021 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 268 over TR1B to Silver Ck is a concrete other carrying TR 268 over TR1B to Silver Ck in Madison County, Illinois. It was built in 1901, so it is 124 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 9% of them trucks, projected to reach 161 by 2046. The structure is 33 ft (10.1 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 268 over TR1B to Silver Ck built?
It was built in 1901, making it 124 years old in 2025.
What condition is TR 268 over TR1B to Silver Ck in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does TR 268 over TR1B to Silver Ck carry?
About 150 vehicles per day (2021 count), of which roughly 9% are trucks.
How long is TR 268 over TR1B to Silver Ck?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 22 ft wide.
Who owns TR 268 over TR1B to Silver Ck?
It is owned by the Town or Township Highway Agency.