FAI-55 Ramps &fr R over Trib to Silver Creek
FairMadison County, Illinois · N of New Douglas RD · Structure no. 060201600000000
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected February 2024
- Type
- Culvert
- Concrete Continuous
- Length
- 23 ft
- 2 main spans
- Daily traffic
- 28,800
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI-55 Ramps &fr R over Trib to Silver Creek is a concrete continuous culvert carrying FAI-55 Ramps &fr R over Trib to Silver Creek in Madison County, Illinois. It was built in 1970, so it is 55 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 28,800 vehicles a day, roughly 28% of them trucks, projected to reach 32,421 by 2046. The structure is 23 ft (7.1 m) long. If it were closed, the detour would be 24.2 mi (39 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI-55 Ramps &fr R over Trib to Silver Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is FAI-55 Ramps &fr R over Trib to Silver Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAI-55 Ramps &fr R over Trib to Silver Creek carry?
About 28,800 vehicles per day (2023 count), of which roughly 28% are trucks.
How long is FAI-55 Ramps &fr R over Trib to Silver Creek?
The structure is 23 ft (7.1 m) long with a longest span of 10 ft (3.2 m).
Who owns FAI-55 Ramps &fr R over Trib to Silver Creek?
It is owned by the State Highway Agency.