TR 309 over Little Crab Orchard
FairJackson County, Illinois · N Lne Sec 31-9-1 · Structure no. 039314800000000
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 900
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
TR 309 over Little Crab Orchard is a prestressed concrete box beam or girders - multiple carrying TR 309 over Little Crab Orchard in Jackson County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 900 vehicles a day, roughly 24% of them trucks, projected to reach 1,061 by 2046. The structure is 56 ft (17.1 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 309 over Little Crab Orchard built?
It was built in 1980, making it 45 years old in 2025.
What condition is TR 309 over Little Crab Orchard in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does TR 309 over Little Crab Orchard carry?
About 900 vehicles per day (2022 count), of which roughly 24% are trucks.
How long is TR 309 over Little Crab Orchard?
The structure is 56 ft (17.1 m) long with a longest span of 55 ft (16.8 m) and a deck 29 ft wide.
Who owns TR 309 over Little Crab Orchard?
It is owned by the City or Municipal Highway Agency.