Ch 13-CHATAUQUA ST over Trib Crab Orchard CR
GoodJackson County, Illinois · 0.2M W of Emarald LN · Structure no. 039313000000000
- Built
- 1976
- 49 years old, rebuilt 1991
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 2,700
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ch 13-CHATAUQUA ST over Trib Crab Orchard CR is a prestressed concrete box beam or girders - multiple carrying Ch 13-CHATAUQUA ST over Trib Crab Orchard CR in Jackson County, Illinois. It was built in 1976 and reconstructed in 1991, so it is 49 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,700 vehicles a day, roughly 6% of them trucks, projected to reach 3,737 by 2046. The structure is 54 ft (16.6 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 13-CHATAUQUA ST over Trib Crab Orchard CR built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 1991.
What condition is Ch 13-CHATAUQUA ST over Trib Crab Orchard CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Ch 13-CHATAUQUA ST over Trib Crab Orchard CR carry?
About 2,700 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Ch 13-CHATAUQUA ST over Trib Crab Orchard CR?
The structure is 54 ft (16.6 m) long with a longest span of 52 ft (15.8 m) and a deck 43 ft wide.
Who owns Ch 13-CHATAUQUA ST over Trib Crab Orchard CR?
It is owned by the City or Municipal Highway Agency.