US Bridges

Country Club Road over Trib to Mud Creek

Good

Jackson County, Illinois · 1.5 MI S Old Il 13 · Structure no. 039500500000000

Built
1999
26 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
700
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Country Club Road over Trib to Mud Creek is a concrete culvert carrying Country Club Road over Trib to Mud Creek in Jackson County, Illinois. It was built in 1999, so it is 26 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 700 vehicles a day, roughly 21% of them trucks, projected to reach 657 by 2046. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCountry Club Road
CrossesTrib to Mud Creek
Location1.5 MI S Old Il 13
RouteCounty Highway 0
Coordinates37.70949, -89.28198
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span31 ft (9.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2022)
Projected traffic657 by 2046
Trucks21%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Country Club Road over Trib to Mud Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is Country Club Road over Trib to Mud Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Country Club Road over Trib to Mud Creek carry?

About 700 vehicles per day (2022 count), of which roughly 21% are trucks.

How long is Country Club Road over Trib to Mud Creek?

The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.6 m).

Who owns Country Club Road over Trib to Mud Creek?

It is owned by the Town or Township Highway Agency.