CH19 Piper Thawvil over N Fk Vermilion R
FairFord County, Illinois · 2110N 1700E · Structure no. 027303100000000
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected April 2023
- Type
- Channel Beam
- Concrete
- Length
- 72 ft
- 3 main spans
- Daily traffic
- 50
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CH19 Piper Thawvil over N Fk Vermilion R is a concrete channel beam carrying CH19 Piper Thawvil over N Fk Vermilion R in Ford County, Illinois. It was built in 1959, so it is 66 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 51 by 2046. The structure is 72 ft (21.9 m) long and 26 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CH19 Piper Thawvil over N Fk Vermilion R built?
It was built in 1959, making it 66 years old in 2025.
What condition is CH19 Piper Thawvil over N Fk Vermilion R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does CH19 Piper Thawvil over N Fk Vermilion R carry?
About 50 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is CH19 Piper Thawvil over N Fk Vermilion R?
The structure is 72 ft (21.9 m) long with a longest span of 23 ft (7 m) and a deck 26 ft wide.
Who owns CH19 Piper Thawvil over N Fk Vermilion R?
It is owned by the County Highway Agency.