Stc 5755;DIVISION over S.Fk.Coeur Dalene River
FairShoshone County, Idaho · In Kellogg;division ST · Structure no. 000000000020545
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 114 ft
- 2 main spans
- Daily traffic
- 1,300
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stc 5755;DIVISION over S.Fk.Coeur Dalene River is a prestressed concrete stringer/multi-beam or girder carrying Stc 5755;DIVISION over S.Fk.Coeur Dalene River in Shoshone County, Idaho. It was built in 1983, so it is 42 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,300 vehicles a day, roughly 17% of them trucks, projected to reach 1,950 by 2042. The structure is 114 ft (34.7 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 5755;DIVISION over S.Fk.Coeur Dalene River built?
It was built in 1983, making it 42 years old in 2025.
What condition is Stc 5755;DIVISION over S.Fk.Coeur Dalene River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Stc 5755;DIVISION over S.Fk.Coeur Dalene River carry?
About 1,300 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is Stc 5755;DIVISION over S.Fk.Coeur Dalene River?
The structure is 114 ft (34.7 m) long with a longest span of 59 ft (18 m) and a deck 54 ft wide.
Who owns Stc 5755;DIVISION over S.Fk.Coeur Dalene River?
It is owned by the City or Municipal Highway Agency.