US Bridges

I 90 Wbl over Division Street

Good

Shoshone County, Idaho · In Kellogg · Structure no. 000000000017136

Built
2023
2 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
165 ft
3 main spans
Daily traffic
5,750
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 Wbl over Division Street is a prestressed concrete box beam or girders - multiple carrying I 90 Wbl over Division Street in Shoshone County, Idaho. It was built in 2023, so it is 2 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,750 vehicles a day, roughly 21% of them trucks, projected to reach 8,625 by 2042. The structure is 165 ft (50.3 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 90 Wbl
CrossesDivision Street
LocationIn Kellogg
RouteInterstate 90
StateIdaho
Coordinates47.5375, -116.11944
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.7 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length165 ft (50.3 m)
Longest span71 ft (21.6 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,750 (2023)
Projected traffic8,625 by 2042
Trucks21%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 Wbl over Division Street built?

It was built in 2023, making it 2 years old in 2025.

What condition is I 90 Wbl over Division Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does I 90 Wbl over Division Street carry?

About 5,750 vehicles per day (2023 count), of which roughly 21% are trucks.

How long is I 90 Wbl over Division Street?

The structure is 165 ft (50.3 m) long with a longest span of 71 ft (21.6 m) and a deck 48 ft wide.

Who owns I 90 Wbl over Division Street?

It is owned by the State Highway Agency.