US Bridges

E Lekeitio Vill DR over Phyllis Canal

Good

Canyon County, Idaho · Nampa NE City Limits · Structure no. 000000000034275

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
150
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Lekeitio Vill DR over Phyllis Canal is a steel stringer/multi-beam or girder carrying E Lekeitio Vill DR over Phyllis Canal in Canyon County, Idaho. It was built in 2024, so it is 1 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 2% of them trucks, projected to reach 225 by 2042. The structure is 60 ft (18.3 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE Lekeitio Vill DR
CrossesPhyllis Canal
LocationNampa NE City Limits
RouteCity Street 0
StateIdaho
Coordinates43.62544, -116.51056
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span56 ft (17.1 m)
Deck width57 ft (17.4 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2024)
Projected traffic225 by 2042
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Lekeitio Vill DR over Phyllis Canal built?

It was built in 2024, making it 1 years old in 2025.

What condition is E Lekeitio Vill DR over Phyllis Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does E Lekeitio Vill DR over Phyllis Canal carry?

About 150 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is E Lekeitio Vill DR over Phyllis Canal?

The structure is 60 ft (18.3 m) long with a longest span of 56 ft (17.1 m) and a deck 57 ft wide.

Who owns E Lekeitio Vill DR over Phyllis Canal?

It is owned by the City or Municipal Highway Agency.