US Bridges

Birch Lane over Phyllis Canal

Fair

Canyon County, Idaho · 2.3 N. 2.5 E. Nampa · Structure no. 000000000027753

Built
2000
25 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
63 ft
1 main span
Daily traffic
12,000
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Birch Lane over Phyllis Canal is a prestressed concrete stringer/multi-beam or girder carrying Birch Lane over Phyllis Canal in Canyon County, Idaho. It was built in 2000, so it is 25 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,000 vehicles a day, roughly 1% of them trucks, projected to reach 18,000 by 2042. The structure is 63 ft (19.2 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBirch Lane
CrossesPhyllis Canal
Location2.3 N. 2.5 E. Nampa
RouteCity Street 0
StateIdaho
Coordinates43.61233, -116.51883
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length63 ft (19.2 m)
Longest span60 ft (18.3 m)
Deck width68 ft (20.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2023)
Projected traffic18,000 by 2042
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Birch Lane over Phyllis Canal built?

It was built in 2000, making it 25 years old in 2025.

What condition is Birch Lane over Phyllis Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Birch Lane over Phyllis Canal carry?

About 12,000 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Birch Lane over Phyllis Canal?

The structure is 63 ft (19.2 m) long with a longest span of 60 ft (18.3 m) and a deck 68 ft wide.

Who owns Birch Lane over Phyllis Canal?

It is owned by the City or Municipal Highway Agency.