US Bridges

Riverview Street over Bellevue Canal

Fair

Blaine County, Idaho · In Bellevue · Structure no. 000000000023703

Built
1980
45 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
25 ft
1 main span
Daily traffic
40
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Riverview Street over Bellevue Canal is a prestressed concrete stringer/multi-beam or girder carrying Riverview Street over Bellevue Canal in Blaine County, Idaho. It was built in 1980, so it is 45 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 40 vehicles a day, projected to reach 60 by 2040. The structure is 25 ft (7.6 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesRiverview Street
CrossesBellevue Canal
LocationIn Bellevue
RouteCity Street 0
StateIdaho
Coordinates43.45497, -114.25892
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38 US tons
Inventory rating23 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span23 ft (7 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2023)
Projected traffic60 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$468,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Riverview Street over Bellevue Canal built?

It was built in 1980, making it 45 years old in 2025.

What condition is Riverview Street over Bellevue Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Riverview Street over Bellevue Canal carry?

About 40 vehicles per day (2023 count).

How long is Riverview Street over Bellevue Canal?

The structure is 25 ft (7.6 m) long with a longest span of 23 ft (7 m) and a deck 32 ft wide.

Who owns Riverview Street over Bellevue Canal?

It is owned by the City or Municipal Highway Agency.