US Bridges

Labrador Lane over Bellevue Canal

Fair

Blaine County, Idaho · 1.3 S. 0.6 E. Bellevue · Structure no. 000000000023658

Built
2000
25 years old
Condition
Fair
inspected September 2024
Type
Frame
Concrete
Length
27 ft
1 main span
Daily traffic
100
2023 count
Owner
County
County Highway Agency

About this bridge

Labrador Lane over Bellevue Canal is a concrete frame carrying Labrador Lane over Bellevue Canal in Blaine County, Idaho. It was built in 2000, so it is 25 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 150 by 2039. The structure is 27 ft (8.2 m) long and 30 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesLabrador Lane
CrossesBellevue Canal
Location1.3 S. 0.6 E. Bellevue
RouteCounty Highway 0
StateIdaho
Coordinates43.44544, -114.24756
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52 US tons
Inventory rating31 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic150 by 2039
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Labrador Lane over Bellevue Canal built?

It was built in 2000, making it 25 years old in 2025.

What condition is Labrador Lane over Bellevue Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Labrador Lane over Bellevue Canal carry?

About 100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Labrador Lane over Bellevue Canal?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.

Who owns Labrador Lane over Bellevue Canal?

It is owned by the County Highway Agency.