US Bridges

Silverberry RD over Big Gulch Wash #4

Good

Ada County, Idaho · Spring Valley Dev · Structure no. 000000000034370

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
32 ft
1 main span
Daily traffic
1,000
2024 count
Owner
County
County Highway Agency

About this bridge

Silverberry RD over Big Gulch Wash #4 is a steel stringer/multi-beam or girder carrying Silverberry RD over Big Gulch Wash #4 in Ada County, Idaho. It was built in 2024, so it is 1 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,100 by 2042. The structure is 32 ft (9.8 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSilverberry RD
CrossesBig Gulch Wash #4
LocationSpring Valley Dev
RouteCity Street 0
StateIdaho
Coordinates43.75204, -116.4267
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length32 ft (9.8 m)
Longest span30 ft (9.1 m)
Deck width51 ft (15.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2024)
Projected traffic1,100 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Silverberry RD over Big Gulch Wash #4 built?

It was built in 2024, making it 1 years old in 2025.

What condition is Silverberry RD over Big Gulch Wash #4 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Silverberry RD over Big Gulch Wash #4 carry?

About 1,000 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Silverberry RD over Big Gulch Wash #4?

The structure is 32 ft (9.8 m) long with a longest span of 30 ft (9.1 m) and a deck 51 ft wide.

Who owns Silverberry RD over Big Gulch Wash #4?

It is owned by the County Highway Agency.