US Bridges

SH 16 over Willow Creek

Fair

Ada County, Idaho · 8.3 S. Emmett · Structure no. 000000000012156

Built
2011
14 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
108 ft
1 main span
Daily traffic
12,000
2023 count
Owner
State
State Highway Agency

About this bridge

SH 16 over Willow Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 16 over Willow Creek in Ada County, Idaho. It was built in 2011, so it is 14 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,000 vehicles a day, roughly 8% of them trucks, projected to reach 18,000 by 2042. The structure is 108 ft (32.9 m) long and 54 ft wide. If it were closed, the detour would be 21.7 mi (35 km).

CarriesSH 16
CrossesWillow Creek
Location8.3 S. Emmett
RouteState Highway 16
StateIdaho
Coordinates43.78078, -116.47358
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.8 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length108 ft (32.9 m)
Longest span105 ft (32 m)
Deck width54 ft (16.5 m)
Roadway width51 ft (15.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2023)
Projected traffic18,000 by 2042
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed21.7 mi (35 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 16 over Willow Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is SH 16 over Willow Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does SH 16 over Willow Creek carry?

About 12,000 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is SH 16 over Willow Creek?

The structure is 108 ft (32.9 m) long with a longest span of 105 ft (32 m) and a deck 54 ft wide.

Who owns SH 16 over Willow Creek?

It is owned by the State Highway Agency.