FM over W Fork Grand
PoorRinggold County, Iowa · 070300303 · Structure no. 000000000298240
- Built
- 1967
- 58 years old
- Condition
- Poor
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 127 ft
- 3 main spans
- Daily traffic
- 120
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FM over W Fork Grand is a concrete continuous slab carrying FM over W Fork Grand in Ringgold County, Iowa. It was built in 1967, so it is 58 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 120 vehicles a day, projected to reach 120 by 2043. The structure is 127 ft (38.7 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Channel and channel protection | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM over W Fork Grand built?
It was built in 1967, making it 58 years old in 2025.
What condition is FM over W Fork Grand in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does FM over W Fork Grand carry?
About 120 vehicles per day (2022 count).
How long is FM over W Fork Grand?
The structure is 127 ft (38.7 m) long with a longest span of 49 ft (14.9 m) and a deck 26 ft wide.
Who owns FM over W Fork Grand?
It is owned by the County Highway Agency.