US Bridges

FM over Waterman CR

Good

O'Brien County, Iowa · 094391401 · Structure no. 000000000258621

Built
2005
20 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
178 ft
3 main spans
Daily traffic
45
2022 count
Owner
County
County Highway Agency

About this bridge

FM over Waterman CR is a prestressed concrete stringer/multi-beam or girder carrying FM over Waterman CR in O'Brien County, Iowa. It was built in 2005, so it is 20 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45 vehicles a day, projected to reach 45 by 2043. The structure is 178 ft (54.3 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesFM
CrossesWaterman CR
Location094391401
RouteCounty Highway 0
StateIowa
Coordinates42.96788, -95.42564
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating48.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length178 ft (54.3 m)
Longest span64 ft (19.5 m)
Deck width32 ft (9.9 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45 (2022)
Projected traffic45 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$50,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was FM over Waterman CR built?

It was built in 2005, making it 20 years old in 2025.

What condition is FM over Waterman CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does FM over Waterman CR carry?

About 45 vehicles per day (2022 count).

How long is FM over Waterman CR?

The structure is 178 ft (54.3 m) long with a longest span of 64 ft (19.5 m) and a deck 32 ft wide.

Who owns FM over Waterman CR?

It is owned by the County Highway Agency.