US Bridges

Local RD over Drainage

PoorClosed to traffic

Madison County, Iowa · 077273204 · Structure no. 000000000234850

Built
1956
69 years old
Condition
Poor
inspected August 2023
Type
Tee Beam
Concrete
Length
31 ft
1 main span
Daily traffic
11
2022 count
Owner
County
County Highway Agency

About this bridge

Local RD over Drainage is a concrete tee beam carrying Local RD over Drainage in Madison County, Iowa. It was built in 1956, so it is 69 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 0 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.

It carries about 11 vehicles a day, projected to reach 11 by 2043. The structure is 31 ft (9.4 m) long and 23 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesLocal RD
CrossesDrainage
Location077273204
RouteCounty Highway 0
StateIowa
Coordinates41.42703, -93.98607
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck0 FailedOut of service and beyond corrective action.
Superstructure0 FailedOut of service and beyond corrective action.
Substructure0 FailedOut of service and beyond corrective action.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadH 15
Structure length31 ft (9.4 m)
Longest span30 ft (9.1 m)
Deck width23 ft (6.9 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11 (2022)
Projected traffic11 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$606,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Local RD over Drainage built?

It was built in 1956, making it 69 years old in 2025.

What condition is Local RD over Drainage in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2023.

How much traffic does Local RD over Drainage carry?

About 11 vehicles per day (2022 count).

How long is Local RD over Drainage?

The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 23 ft wide.

Who owns Local RD over Drainage?

It is owned by the County Highway Agency.