Neely Trail over Willow Creek
PoorClosed to trafficHarrison County, Iowa · 080432707 · Structure no. 000000000178910
- Built
- 1940
- 85 years old
- Condition
- Poor
- inspected November 2014
- Type
- Truss - Thru
- Steel
- Length
- 148 ft
- 1 main span
- Daily traffic
- 45
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Neely Trail over Willow Creek is a steel truss - thru carrying Neely Trail over Willow Creek in Harrison County, Iowa. It was built in 1940, so it is 85 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 0 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 45 vehicles a day, projected to reach 45 by 2043. The structure is 148 ft (45.1 m) long and 14 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 0 Failed | Out of service and beyond corrective action. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Neely Trail over Willow Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Neely Trail over Willow Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2014.
How much traffic does Neely Trail over Willow Creek carry?
About 45 vehicles per day (2022 count).
How long is Neely Trail over Willow Creek?
The structure is 148 ft (45.1 m) long with a longest span of 100 ft (30.5 m) and a deck 14 ft wide.
Who owns Neely Trail over Willow Creek?
It is owned by the County Highway Agency.