US Bridges

Pryor Street over I-75

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012100560

Built
1986
39 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
431 ft
2 main spans
Daily traffic
7,760
2024 count
Owner
State
State Highway Agency

About this bridge

Pryor Street over I-75 is a steel continuous stringer/multi-beam or girder carrying Pryor Street over I-75 in Fulton County, Georgia. It was built in 1986, so it is 39 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,760 vehicles a day, roughly 1% of them trucks, projected to reach 9,330 by 2032. The structure is 431 ft (131.4 m) long and 91 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPryor Street
CrossesI-75
LocationIn Atlanta
RouteCity Street 9166
StateGeorgia
Coordinates33.72989, -84.39267
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.9 US tons
Inventory rating35.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length431 ft (131.4 m)
Longest span233 ft (71 m)
Deck width91 ft (27.7 m)
Roadway width76 ft (23.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,760 (2024)
Projected traffic9,330 by 2032
Trucks1%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pryor Street over I-75 built?

It was built in 1986, making it 39 years old in 2025.

What condition is Pryor Street over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Pryor Street over I-75 carry?

About 7,760 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Pryor Street over I-75?

The structure is 431 ft (131.4 m) long with a longest span of 233 ft (71 m) and a deck 91 ft wide.

Who owns Pryor Street over I-75?

It is owned by the State Highway Agency.