US Bridges

Epcot Resorts Blvd over Canal L-403

Good

Orange County, Florida · Cfl Tourism Overs. Dist. · Structure no. 756065

Built
2020
5 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
6,189
2019 count
Owner
Private
Private (other than railroad)

About this bridge

Epcot Resorts Blvd over Canal L-403 is a prestressed concrete stringer/multi-beam or girder carrying Epcot Resorts Blvd over Canal L-403 in Orange County, Florida. It was built in 2020, so it is 5 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,189 vehicles a day, roughly 5% of them trucks, projected to reach 10,676 by 2041. The structure is 100 ft (30.5 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEpcot Resorts Blvd
CrossesCanal L-403
LocationCfl Tourism Overs. Dist.
RouteCity Street 0
StateFlorida
Coordinates28.37267, -81.55475
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.4 US tons
Inventory rating37.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span100 ft (30.5 m)
Deck width42 ft (12.7 m)
Roadway width32 ft (9.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,189 (2019)
Projected traffic10,676 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Epcot Resorts Blvd over Canal L-403 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Epcot Resorts Blvd over Canal L-403 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Epcot Resorts Blvd over Canal L-403 carry?

About 6,189 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Epcot Resorts Blvd over Canal L-403?

The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 42 ft wide.

Who owns Epcot Resorts Blvd over Canal L-403?

It is owned by the Private (other than railroad).