US Bridges

Epcot Center DR over Epcot Parking Access

Good

Orange County, Florida · Epcot Exit R-Entrance RD · Structure no. 756703

Built
1980
45 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
213 ft
4 main spans
Daily traffic
3,001
2023 count
Owner
Private
Private (other than railroad)

About this bridge

Epcot Center DR over Epcot Parking Access is a prestressed concrete stringer/multi-beam or girder carrying Epcot Center DR over Epcot Parking Access in Orange County, Florida. It was built in 1980, so it is 45 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,001 vehicles a day, roughly 5% of them trucks, projected to reach 5,001 by 2042. The structure is 213 ft (64.9 m) long and 40 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesEpcot Center DR
CrossesEpcot Parking Access
LocationEpcot Exit R-Entrance RD
RouteCity Street 0
StateFlorida
Coordinates28.38149, -81.55308
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating58.2 US tons
Inventory rating34.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length213 ft (64.9 m)
Longest span89 ft (27.1 m)
Deck width40 ft (12.3 m)
Roadway width37 ft (11.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,001 (2023)
Projected traffic5,001 by 2042
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Epcot Center DR over Epcot Parking Access built?

It was built in 1980, making it 45 years old in 2025.

What condition is Epcot Center DR over Epcot Parking Access in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Epcot Center DR over Epcot Parking Access carry?

About 3,001 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Epcot Center DR over Epcot Parking Access?

The structure is 213 ft (64.9 m) long with a longest span of 89 ft (27.1 m) and a deck 40 ft wide.

Who owns Epcot Center DR over Epcot Parking Access?

It is owned by the Private (other than railroad).