US Bridges

Epcot Resorts Blvd over Canal L-403

Good

Orange County, Florida · Cftod · Structure no. 756064

Built
2022
3 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
115 ft
1 main span
Daily traffic
4,401
2022 count
Owner
Private
Private (other than railroad)

About this bridge

Epcot Resorts Blvd over Canal L-403 is a prestressed concrete stringer/multi-beam or girder carrying Epcot Resorts Blvd over Canal L-403 in Orange County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,401 vehicles a day, roughly 1% of them trucks, projected to reach 7,635 by 2042. The structure is 115 ft (35.2 m) long and 61 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEpcot Resorts Blvd
CrossesCanal L-403
LocationCftod
RouteCity Street 0
StateFlorida
Coordinates28.37033, -81.56294
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.7 US tons
Inventory rating42.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length115 ft (35.2 m)
Longest span114 ft (34.6 m)
Deck width61 ft (18.7 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,401 (2022)
Projected traffic7,635 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Epcot Resorts Blvd over Canal L-403 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Epcot Resorts Blvd over Canal L-403 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Epcot Resorts Blvd over Canal L-403 carry?

About 4,401 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Epcot Resorts Blvd over Canal L-403?

The structure is 115 ft (35.2 m) long with a longest span of 114 ft (34.6 m) and a deck 61 ft wide.

Who owns Epcot Resorts Blvd over Canal L-403?

It is owned by the Private (other than railroad).