US Bridges

Jeff Fuqua Blvd NB over Rail Corridor

GoodPosted for load

Orange County, Florida · 1.5 M N/O Heintzelman · Structure no. 755956

Built
2017
8 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
88 ft
2 main spans
Daily traffic
28,500
2024 count
Owner
Local
Other Local Agency

About this bridge

Jeff Fuqua Blvd NB over Rail Corridor is a concrete culvert carrying Jeff Fuqua Blvd NB over Rail Corridor in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 28,500 vehicles a day, roughly 5% of them trucks, projected to reach 49,448 by 2044. The structure is 88 ft (26.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesJeff Fuqua Blvd NB
CrossesRail Corridor
Location1.5 M N/O Heintzelman
RouteCity Street 0
StateFlorida
Coordinates28.41838, -81.3059
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 23 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.8 US tons
Inventory rating42.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length88 ft (26.8 m)
Longest span41 ft (12.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic28,500 (2024)
Projected traffic49,448 by 2044
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Jeff Fuqua Blvd NB over Rail Corridor built?

It was built in 2017, making it 8 years old in 2025.

What condition is Jeff Fuqua Blvd NB over Rail Corridor in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Jeff Fuqua Blvd NB over Rail Corridor carry?

About 28,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Jeff Fuqua Blvd NB over Rail Corridor?

The structure is 88 ft (26.8 m) long with a longest span of 41 ft (12.5 m).

Who owns Jeff Fuqua Blvd NB over Rail Corridor?

It is owned by the Other Local Agency.