US Bridges

South Access Road over Jeff Fuqua Blvd

Good

Orange County, Florida · 1.6 M N/O Heintzelman · Structure no. 755949

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
78 ft
1 main span
Daily traffic
1,001
2023 count
Owner
Local
Other Local Agency

About this bridge

South Access Road over Jeff Fuqua Blvd is a concrete stringer/multi-beam or girder carrying South Access Road over Jeff Fuqua Blvd in Orange County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,001 vehicles a day, projected to reach 1,737 by 2042. The structure is 78 ft (23.8 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSouth Access Road
CrossesJeff Fuqua Blvd
Location1.6 M N/O Heintzelman
RouteCity Street 0
StateFlorida
Coordinates28.41958, -81.30683
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59 US tons
Inventory rating45.4 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length78 ft (23.8 m)
Longest span78 ft (23.8 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,001 (2023)
Projected traffic1,737 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was South Access Road over Jeff Fuqua Blvd built?

It was built in 2017, making it 8 years old in 2025.

What condition is South Access Road over Jeff Fuqua Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does South Access Road over Jeff Fuqua Blvd carry?

About 1,001 vehicles per day (2023 count).

How long is South Access Road over Jeff Fuqua Blvd?

The structure is 78 ft (23.8 m) long with a longest span of 78 ft (23.8 m) and a deck 41 ft wide.

Who owns South Access Road over Jeff Fuqua Blvd?

It is owned by the Other Local Agency.